2015-2016
Prefabrication and erection of light fuel oil storage tank V=1600 m³ at Gdynia Power Plant, EDF Polska S.A.
References can be forwarded upon request.
2015-2016
Prefabrication and erection of two light fuel oil storage tanks with the capacity of 1600 m³ each, EDF Polska S.A., Krakow Power Plant
References can be forwarded upon request.
2018-2019
Design, delivery and erection of two fermenters TK-401E AND TK-401F with a capacity of 2500m³ each including equipment installation, platforms and ladders, corrosion protection and thermal insulation BIOAGRA S.A. „GOŚWINOWICE” Ethanol Plant
2014-2015
Supply and erection of supporting steel structure of flue gas ducts for Flue Gas Desulfurization (FGD) System, Krakow Power Plant, EDF Polska S.A.
2013-2015
Supply and erection of carbon steel tanks for Flue Gas Desulfurization (FGD) System, Wrocław Power Plant
References can be forwarded upon request.
2013-2015
Supply and erection of carbon steel tanks for Flue Gas Desulfurization (FGD) System, Gdańsk Power Plant, EDF Wybrzeże S.A.
2013-2015
Supply and erection of carbon steel tanks for Flue Gas Desulfurization (FGD) System, Gdynia Power Plant, EDF Wybrzeże S.A.
References can be forwarded upon request.